Royal
Australian Air Force
When the
Royal Australian Air Force purchased multiple sets of
portable radar stations, Tenix defence systems were the
project co-ordinators, Nilsen electrical were
responsible for the design and construction, the Project
Engineer responsible for the design of the multi-million
dollar military project says…. "We Used
Solutions Electrical software because of the exacting
standards laid down by the military, it performed
flawlessly for all our designs and calculations. Thanks
to Solutions Electrical software we completed the job
ahead of schedule and saved money at the same time. We
would not be without it… Thanks for a Brilliant
program!" – David (Project Engineer,
Nilsen Electrical)
Ford
Motor Company
When Ford
Motor Company carried out a complete upgrade of their
existing plant at their Broadmeadows facility in
Melbourne, Australia the Project Engineer responsible
for the $ 85 million dollar “Turn Key” project
says… "We looked at several electrical
software programmes – only one was capable of
delivering everything we needed, Solutions Electrical
software saved us months of work and eliminated the need
for extra design and drafting personnel. We saved over
$50,000 just on cable costs alone"
– J Wood (Project Engineer G.E.C Alsthom)
Queensland Rail (Australia)
"This
is just the sort of software we have been looking for.
It has saved us so much time finding cable sizes and
fault level calculations for our maintenance department.
– Thanks!" – Gary McKewan (Technical
Officer)
Mr E Smith (Electrical Contractor, Brisbane)
– "The very first job I did using
Solutions Electrical V12 Professional I beat a
large Electrical Engineering consultant company by
$13,000 and won the work. This program is amazing,
I win most of the jobs I go after now both on
price and getting in first with the completed
drawings and calculations. I feel I can easily
take on any size job now…Simply Awesome!"
Scott Hassan (Electrical Contractor) – "We
find it very good, very handy. We use it to check
the consultants calculations and when we find
errors we notify them to make the necessary
adjustments. We’ve also used it for compliance
checking of existing designs"
Gary (Electrical Contractor, Victoria) – "Paid
for itself in the first week, would not be without
it. It’s very easy to use. The Cable
Calculations and maximum demand are what we use it
for most, it saves me literally hours of work. I
would never go back to the old ways."
David (ACT Electrical Golburn) – "Definately
saves me Time and Money, very useful, extremely
helpful in compliance checking."
Bas Varney (Electrical Contractor, Victoria)
– "Being a small contractor I do a wide
variety of commercial and domestic jobs. I needed
a software programme I could use on the move.
Solutions Electrical is just what we needed. I can
perform these electrical calculations easily on my
laptop computer."
Stephen Sanasee (Engineer, Toyota) – "We
purchased a number of these programmes (6 so far).
Solutions Electrical has saved us a lot of time.
The electricians can now perform many of the
electrical tests such as Fault levels and Earth
Loop Impedance testing and cable
calculations." |
|
John Lloyd (Sales Engineer, NHP) – "This
programme has made my life so easy. When
performing Power Factor calculations, I can give
my clients all the information they need to make
decisions there and then."
Mr Stuart (Electrical Certification Australia)
– "We have used other programmes.
Nothing compares to the simplicity of these
programmes. Thank you!"
Anthony (Olex Cables) – "This
software is brilliant. I can be on the phone to a
customer and size a cable for them at the same
time."
Mr Bill Tewerik (Office of the Chief Electrical
Inspector) – "We decided on
Solutions Electrical as we feel this software
fills all of our needs. It has made Fault levels
and Maximum demand so easy to perform; we also use
it to investigate accidents and incidents. We
would not be without it."
Electrical Audit Australia – "Our
Electrical Inspectors have been using this
software for almost two years, there’s nothing
like it."
Neil Anstee (Electrical Contractor) – "I
employ a number of electricians. My business is in
the commercial and industrial sector; This
programme fits my needs perfectly. It’s very
easy to use and I can perform 5 days of cable
calculations in about an hour with this software.
Ian Cooper (Electrical Contractor) – "My
work is mainly in the industrial sector: This
programme has really opened my eyes as to what I
can now achieve. It has already saved me a lot of
time and money and made me feel as though the job
has been engineered correctly. I feel I can take
on any size job with this software."
|
|